Skip to content
Call (847) 987-3762
STEELGRIDROBOTICS

Automated storage · AMR integration · WMS

2x storage.
Same space.

Double your storage: 2x the pallet positions in the same building. Cut warehouse staff by up to 85%. Run 24/7. Tell us about your operation. We'll propose how to optimize it.

Get a proposal
2xStorage
Double your storage: 2x the pallet positions in the same building.
Up to 85%Fewer people
Cut warehouse staff by up to 85%. Put robots on the driving, lifting and storing.
24/7Operation
Run 24/7. Go from 9-to-5 shifts to around the clock. Robots work around the clock.

Inside a running warehouse

Inside the steel grid

Explore the footage

How it works

Cut warehouse staff by up to 85%

  1. 01

    Checked before storage

    Pallets are scanned, weighed and size-checked. Loads that fail are rejected before storage.

  2. 02

    Lifted into more space

    Lifters carry pallets and shuttles between levels. Put the height above your floor to work.

  3. 03

    Stored deep in the grid

    Shuttles store pallets deep in the steel rack grid. Forklift aisle space becomes storage.

  4. 04

    Directed by one system

    WMS and WCS track stock and direct robot tasks. Your team sees the warehouse at work in 3D.

Capacity calculator

How much more could your building hold?

Enter your building size. Estimate pallet positions with a four-way shuttle system and compare them with selective racking.

Capacity estimate

A rough estimate. Share your floor plan so an engineer can check what fits.

Install and service

We install it. We support it.

Our engineers install and commission your system. After go-live, we provide remote support, spare parts support and training built for your team.

  • CE (shuttle/RGV)
  • CE (lifter)
  • CE (conveyors)
  • ISO 9001
  • ISO 14001
  • ISO 45001
  • CMMI-DEV V3.0 Maturity Level 5
  1. 01

    Start with your operation

    Tell us where you need more space, less labor or longer operating hours. We review your building, loads and flow to check what fits.

  2. 02

    Plan the space and flow

    We lay out the racks, load paths and controls, then simulate how they work together. The design starts with the storage and flow you need.

  3. 03

    Prepare and test the system

    Equipment and software are prepared for your site. Checks cover shuttles, lifters, conveyors, controls and racking before installation.

  4. 04

    Install and prove the flow

    Our engineers install and commission the system on your site. Trial runs check the equipment and flow before handover.

  5. 05

    Put your team in control

    Your team gets training built for your system. We hand over the project documents as part of acceptance.

  6. 06

    Support after go-live

    Once you are running, we provide after-sales service: remote support, spare parts support and training built for your team.

Plan your warehouse

Double your storage. Run 24/7.

Get 2x the pallet positions in the same building. Cut warehouse staff by up to 85%. Tell us about your operation. We'll propose how to optimize it. An engineer replies personally.

Get a proposal